Cost Estimator

Our project costing calculator (below) can be used for you to instantly calculate your approximate project costs. Simply input the number of units for each item and the calculator will instantly update your estimate.

Remember that for all our mobilization costs, there is a 100km minimum charge. In order to determine your mobilization costs, click “View Google Map – Get Directions” on our interactive map and enter your location. Generally, within our minimum, we can get to Burlington, Hamilton, Mississauga, Milton, most areas of Brampton, Etobicoke, and south/central Toronto. As a rough guideline, we can get as far as Niagara, Kitchener/Waterloo, Guelph, Newmarket/Aurora, Vaughan, Scarborough, Markham etc within 200km.

Our mobilization and drilling rates are dependent on what drill you need and how many different drills we use to get the job done. If you need to use several different drills all on the same day or same project, we can bring them all for one mobilization and drilling rate; except the Mini-Mole and Big Beaver together. If you need both of these drills, you will be charged a service truck fee for the additional truck required to bring the extra drill and accessories.

If you need more equipment such as a water level meter, interface meter, PID, gastech, surveying equipment (among other equipment), we’ll even supply that at no charge; just make sure and let us know you need it so we can bring it along with us.

If you are familiar enough with our equipment and the factors that determine project costing, you could input the information yourself, to get a ballpark estimate of your project costs. If you would like some guidance on how many hours and what supplies WE think it will take to get the job done, please do not hesitate to call Randy at our offices (905 825 2943 – or contact us) to discuss the project. We can help you with the inputs, so that you can instantly come up with your cost estimate.

Once you have completed your inputs, you can convert the file to pdf (”Create PDF” link below) and print it for your files.

Project Cost Estimate
Task / Item Unit Cost Units Total
Mini Mole

$155/hr*

$0

Mileage/mobilization (Mini Mole) (100km min.)

$2/km

$0

Big Beaver

$130/hr*

$0

Pionjar or Rota-Hammer or PEP

$120/hr*

$0

Mileage/mobilization (except Mini Mole) (100km min)

$1.50/km

$0

Indoor kit (per job)

$75

$0

Standby Rate

$90/hr

$0

Overtime**

Add $40/hr**

$0

Weekends

Add $80/hr

$0

Nights

Add $100/hr

$0

Concrete core machine/bit usage

$25/hole

$0

Service Truck

$1/km

$0

Extra Technician and shop time

$48/hr

$0

Well log

$100

$0

Accomodation/Meals

 
 
Supplies Total (Includes 8% PST Recovery) $0

Total Estimate (does not include GST) $0
If paid within 45 days, you can deduct $10/hr from the drilling rates, which would
amend the estimate to:
$0

Supplies (1″ or 2″ wells)
Task / Item Unit Cost Units Total
Sand (View Calculator)

$15.00

$0

Holeplug & Benseal (View Calculator)

$20.00

$0

Screen (5 feet)

$30.00

$0

Screen (10 feet)

$45.00

$0

Riser (5 feet)

$20.00

$0

Riser (10 feet)

$30.00

$0

Slip Cap

$5.00

$0

Threaded Cap or Point

$15.00

$0

J Plug (Lockable)

$20.00

$0

Lock (weather resistant)

$20.00

$0

Flushmount or aboveground casing

$100.00

$0

Small Royer Flushmount (4″)

$75.00

$0

Concrete and Coldpatch

$20.00

$0

Waterra Tubing

$0.40/foot

$0

Waterra Valves – (D25/D16)

$20.00

$0

Bailer (small and large)

$15.00

$0

Barrel (45gal)

$40.00

$0

Sand traps

$3.00

$0

PST Recovery (8%) $0

Supplies Total(Includes 8% PST Recovery) $0

Total Estimate (does not include GST) $0

Convert to PDF (Download Adobe AcrobatClick to download Acrobat Reader)

Prices do not include taxes

Note: Indoor kit charge applies to all indoor project and includes concrete core machine, shop vac, generator, lights, exhaust kit, long hydraulic hoses, air exhaust machine, broom, mop/bucket, squeegee, hammer drill, coring anchors, plastic sheeting, alturnamats

*Kodiak offers a discount of $10/hr from our drilling rates for invoices that are paid within 45 days

** Overtime includes drilling hours beyond 8hrs/day, or for more than 12hrs/day total time (for mobe, drilling and demobe – i.e., door to door from Kodiak offices).

All Utility Locates Must Be Completed Before Any Drilling Program Can Begin